Given the total cost function; TC = 3Q3 - Q2 + 150Q +50
A. What is the fixed cost and what does it shows?
B. What is the variable cost function? What is the variable cost at Q = 2?
C. What is the maximum output level at the minimum level of average variable cost
D. At Q = 3 what Is the trend of average cost function (is that increasing or decreasing)? Why?
"VC=3Q^3-Q^2+150Q"
"VC\\vert_{Q=2}=320"
"AVC=\\frac{VC}{Q}=3Q^2-Q+150"
"\\frac{\\delta AVC}{\\delta Q}=6Q-1"
"Q_{min}=\\frac{1}{6}"
"\\frac{\\delta AVC}{\\delta Q}\\vert_{Q=3}=17>0"
The trend of average cost function is increasing.
Comments
Leave a comment