4. In bridge widening projects, the method of stitching is normally employed for connecting existing deck to the new deck. What are the problems associated with this method in terms of shrinkage of concrete?
One of the key problems is the consequence of stress made by shrinkage of afresh broadened part of the bridge on the prevailing bridge.
Comments
Leave a comment