Civil and Environmental Engineering Answers

Questions: 1 228

Answers by our Experts: 1 131

Need a fast expert's response?

Submit order

and get a quick answer at the best price

for any assignment or question with DETAILED EXPLANATIONS!

Search & Filtering

25. How do engineer determine the number of cells for concrete box girder bridges?


14. What is the function of rebate in a typical construction joint?


1. What are the functions of different components of a typical expansion joint?


Initial setting time of cement for asbestos cement products should be not less than

A.30 minutesB.50 minutesC.75 minutesD.90 minutes.


For melting one tonne of cast iron

A.700 m3 air is required

B.20 kg limestone is required

C.one quintal coke is required

D.all the above.


Pick up the polymineralic rock from the following:
A. Quartz sand
B. Pure gypsum
C. Magnesite
D. Granite
E. None of these.
Wrought iron contains carbon upto
A. 0.25%
B. 1.0%
C. 1.5%
D. 2%.
How long will it take for $10,000, invested at 5% per year, compounded continuously, to triple in value?
Jack deposited $500,000 into a bank for 6 months. At the end of that time, he withdrew the money and received $520,000. If the bank paid interest based on continuous compounding:
a. What was the effective annual interest rate?
b. What was the nominal annual interest rate?
A bank pays 10% nominal annual interest on special three-year certificates. What is the effective annual interest rate if interest is compounded
a. Every three months?
b. Daily?
c. Continuously?
LATEST TUTORIALS
New on Blog
APPROVED BY CLIENTS