Government has given you a project of major renovation in railway infrastructure. The project consists of following work. a. Feasibility study of changes required b. Estimating the cost – Material and Construction c. Providing the support to Railway for procuring the material d. Construction and installation of the changes required e. Testing of the infrastructure f. Training and handing over the infrastructure. You as a project controller are asked to submit your plan for project control. Cover different project control tools and explain how they will be applied in this case. Also, mention as a head of project control which control you will monitor personally and why
The project control process includes planning, monitoring, and regulating all aspects of a capital project's life cycle. Estimating and scheduling, as well as risk and trade management, are examples of this. The success of a project hinges on proper planning. Only an effective pricing and schedule control strategy can assure that a project based on a strong project plan is completed. As project manager, I will guarantee that the following guidelines are followed during the construction process:
a) First and foremost, a feasibility study will be conducted to determine what adjustments should be done.
b) Then go on to estimating and costing, as well as all of the items that will be used throughout construction.
c) The materials' quality must be assured before they may be used in building.
d) Work configuration and engineering must be done correctly, and the installation must be completed.
e) Following that, any type of calamity should be thoroughly tested and examined. If it is discovered, it must be resolved.
f) The authorities will get all papers, a strength assessment, and the completed project.
As the project manager, I will guarantee that the construction and installation are thoroughly inspected, as this will have an impact on the entire project. As a result, evaluating and monitoring the construction will provide us with a sense of how the project is progressing.