"S=8\\cdot S_1" is the area of the lateral surface of the monument
"S_1" is the area of one side of the monument
"P_1=730\\space PhP" is the price per square meter
"P=S\\cdot P_1" is the total cost of painting the lateral surface of the monument
"S_1=\\sqrt{p\\cdot(p-a)\\cdot(p-b)\\cdot(p-c)}"
"a=b=3"m
"c=2m"
"p=\\frac {a+b+c}2=\\frac {3+3+2}2=4m"
"S_1=\\sqrt{p\\cdot(p-a)\\cdot(p-b)\\cdot(p-c)}=\\sqrt{4\\cdot(4-3)\\cdot(4-3)\\cdot(4-2)}=2\\sqrt {2}m^2"
"S=16\\sqrt{2}m^2"
"P=S\\cdot P_1=16\\sqrt{2}\\cdot730\\approx16518\\space PhP"
Comments
Leave a comment