Answer to Question #207401 in Programming & Computer Science for Jessy

Question #207401

Study the narrative that follows and draw an activity diagram.


An assembly robot, Fuji Automatic Numerical Control (FANUC) in a production line do many tasks with speed

and precision, outperforming any human being. To do this they have a vision sensing system or machine vision,

and a force sensing system, accompanied by incredible axes configurations, that can provide as many as six

axes of motion.

Your company was approached to develop a production control system (PCS) for FANUC, and you as an

analyst has been allocated the task of designing the software module that inspects the items for quality

purposes. This means FANUC, through your control software, must pick items randomly from the production line

and inspect them for completeness of manufacture. It is of note that ‘pick’ is not just a physical activity, but

rather a process, consisting of sophisticated statistical procedures calculating randomness and it also involves

the vision component of the robot to identify an item on the production line.

So, the requirement is to develop a fully automated robot/ “system” that will inspect any item on the production

line and communicate the quality results to a ‘node’ that is part of the PCS.

The process is as follows: FANUC will pick up an item, reads the universal product code (UPC) and convey this

information to the PCS for validation purposes. If validated, the system will respond and inform FANUC to

proceed. Otherwise it will inform FANUC to place it on the rejection conveyer belt.

If validated, FANUC will then inspect the item and calculate a status check. After this check, it will send the state

information to the system. The system will update the database with the new information.

It will place the item back on the production line, picks up the next item, just to repeat the above procedure. At

the end of the day, it will send a production report to the system. The system will on its turn, send a copy to

production management.


1
Expert's answer
2021-06-17T15:33:40-0400
Dear Jessy, your question requires a lot of work, which neither of our experts is ready to perform for free. We advise you to convert it to a fully qualified order and we will try to help you. Please click the link below to proceed: Submit order

Need a fast expert's response?

Submit order

and get a quick answer at the best price

for any assignment or question with DETAILED EXPLANATIONS!

Comments

No comments. Be the first!

Leave a comment

LATEST TUTORIALS
New on Blog
APPROVED BY CLIENTS