Software Engineering Answers

Questions: 639

Answers by our Experts: 505

Need a fast expert's response?

Submit order

and get a quick answer at the best price

for any assignment or question with DETAILED EXPLANATIONS!

Search & Filtering

For this assignment, we will take an idea for a system, and then break it down into a general architecture. Feel free to choose any idea you like. Check out the last video as well as my answer to this assignment for examples.

Try to break up your idea into at-least 7 different areas for you example.

You can write the solution out, or if you want, draw it up on paper and upload the image.

Questions for this assignment
What is your initial idea?

How would you separate the architecture in it? (No right way to do this. Be creative, and display it in a way that feels natural.
CLD AND DFD diagram for Restaurant management system
Suppose two programs A and B run in two processors P and Q respectively. If A has twice as
many instructions than B and Q has three times Clock speed than P, then what will be the
performance ratio of A and B? Both programs take same amount of clock per instruction.
A program of 200 instructions runs in a processor of 5GHz and takes 3.5 ns.How many clock
cycles does each instruction take?
1) Suppose a software developer has to design a small software for Library management system, but the requirements of the application are incomplete. Keeping this situation in your mind, answer the following questions:
1) Is it possible to develop a software with incomplete requirements? Justify you answer.
2) Does the incomplete requirement affect the quality of the application?
Define the object and classes with reference to object oriented concepts
Computer Aided Design (CAD) is composed of a set of methods and tools to assist product​
designers in 5 different operations, from your own research, discuss these operations in details.
1. Your company Cellular Inc. is developing a simple and cheap cellular phone especially
for older people. Make a list of user requirements that in your opinion define the
functional requirements of the new cellular phone software giving to each an adequate
priority.
2. Give non-functional requirements to the new Cellular Inc. phone for older people.
“Component-based Software Engineering allows faster delivery”. State whether this statement is true or false. Justify your answer


A small core group of educators and systems analysts will need at least six months to start again from scratch to design a viable product. Programming and testing could take another six months. Another option would be to go ahead and release the current version of the product and then, when the new product is ready, announce it as a new release. This would generate the cash flow necessary to keep your company afloat and save the jobs of 10 or more of your 15 employees. Given this information about your company’s product, what would you do?


LATEST TUTORIALS
New on Blog
APPROVED BY CLIENTS