Calculate the pH of 50 ml of 0.1000 M methylamine solution after the following volume of 0.1000 M HNO3, where added 25
Calculate the pH of 50 ml of 0.1000 M methylamine solution after the following volume of 0.1000 M HNO3, where added 0
The marks of 50 students (out of 60) in a certain examination are given below Marks
20-25
26-31
32-38
38-44
44-50
50-56 No. of students
7
13
12
6
8
4
Compute the following measures of central tendencies and variations
a) Mean
b) Median
c) Mode
d) Mean deviation about the median
e) First quartile (Q1)
f) 3rd decile (D3)
g) 50th percentile (P50)
h) Coefficient of variation
Determine the inverse of A, and show that A
−1A = I.
A =
(2 1 0
2 −1 1
3 −2 4)
There are common elements that teachers must include to meet the learners needs,interests and diversity when designing the grade R daily programmes. Demonstrate your understanding of these elements by describing any five that you think are important
Two stones are thrown vertically upward from the ground, one with three times the initial speed of the other. (a) If the faster stone takes 10 s to return on the ground, how long will it take the slower stone to return? (b) If the slower stone reaches a maximum height of H, how high (in terms of H) will the faster stone go? Assume the two stones are freely falling objects.
Draw the directed graph of the following relation and identify the type relation on {a,b,c,d,e}.
A) [(a,c),(b,d),(c,a),(d,b),(e,d)]
Describe how you would coordinate donor project budget development process, what are the elements you would check in the budget? What are the important persons/ departments that should be involved and how?
What additional budget related annexes should normally accompany a budget proposal? Please describe each of them with their specific purpose. And what would be the program coordinator - budgeting coordinator’s role in preparing these documents?
What criteria have to be met to ensure eligibility of costs in a certain budget development. And how do you deal with a situation where a given budget inputs are unrealistic and/or unrelated to the overall aim of the project proposal and donor requirement?